Project Info
- Client DC Public Schools/DC DGS
- Location Washington, DC
- Cost $398,000
- Size 20,000 sf
GES provided engineering and construction administration services for the upgrade of the HVAC system for the 20,000 sf auditorium. The 700+ person auditorium had an outdated system that needed to be brought up to code and modern standards. GES initially provided an assessment of the existing system and addressed all the deficiencies in the design. Design and construction was fast tracked and completed on time.