News

Bailey’s Crossroads Fire Station

As a result of structural damage caused from a winter storm, the existing 11,000sf Bailey’s Crossroads Volunteer Fire Station was demolished and a new Fairfax County owned fire station was constructed. GES provided the MEP & FP engineering services for the new 16,000sf fire station, which includes an area for the Bailey’s Crossroads Fire Station volunteers and four apparatus bays with associated living spaces and vehicle parking. The project features a new variable refrigerant flow system, plymovent vehicle exhaust system, radiant tube gas heaters in the apparatus bay, and an... Continue Reading

Renovation of the National Center for Biotechnology Information Office

This project renovated 18,000 sf of space on the 4th floor and a portion of the 5th floor of the building for The National Center for Biotechnology Information (NCBI) for office and administrative support space. The office space consists of open (cubicle) offices, private office suites and a conference room in the fourth floor space. The design team incorporated design flexibility and the provision of natural light into the enclosed and open offices. GES provided mechanical, electrical, plumbing and fire protection engineering services.  The mechanical design included modifying the HVAC... Continue Reading

Office of Thrift Supervision Headquarters

GES provided a facility condition assessment for OTS 494,000 gsf Headquarters Building. As part of the project, an initial survey of the existing systems was completed which allowed for an evaluation of the building condition and development of opportunities to enhance sustainability and energy efficiency. The result was a comprehensive ten-year plan for building-wide systems and components upgrades, which included a conceptual design for an immediate and long term strategic... Continue Reading

Life Reimagined Innovation Laboratory Renovation

GES provided mechanical, electrical, plumbing and fire protection engineering services for the build-out of 25,000 sf of shell space across two floors. The innovation laboratory features open collaborative areas, flexible conferencing areas with removable walls, team rooms, an outdoor patio area, and cafe. Other spaces include office and administrative spaces with open work areas, and furniture... Continue Reading

School Libraries Project

As part of the DCPS School Libraries Project, GES provided electrical engineering (power, lighting, fire alarm and communications) services for the renovation of 8 existing school libraries in DC. The existing libraries of Brent ES, Ludlow Taylor ES, Maury ES, Stuart Hobson MS, Peabody ES, Payne ES, Tyler ES and Watkins ES were turned into technologically advanced Media Centers. GES received the 2006 Washington Architectural Foundation Pro Bono Publico Award for the Stuart Hobson Middle School... Continue Reading

Collection Area Planning and Reorganization

GES provided mechanical, electrical, plumbing and fire protection services to improve the efficiency and quality of the document collections areas at the National Library of Medicine. Project includes consolidating and stacking 51,000 sf of non-storage facilities such as offices, workstations, restrooms and a mechanical room away from the collections areas to minimize any damage associated with water leaks or variations in temperature and... Continue Reading

Tunnel Dewatering Pump Station and Enhanced Clarification Facility

GES provided mechanical, plumbing, fire protection, and process engineering for the new $215 million Tunnel Dewatering Pump Station (TDPS) and Enhanced Clarification Facility (ECF), which was constructed at the Blue Plains advanced wastewater treatment plant in Washington, DC. The TDPS-ECF were part of the larger DC Clean Rivers Project, mandated under a federal consent decree between the United States, the District Government and DC Water, to build tunnels to temporarily store combined sewer (sanitary and storm) overflows until they could be pumped to the treatment... Continue Reading

Washington Dulles International Airport – Concourse C/D Rehabilitation

GES served as the sub-consultant on a task order contract to prepare construction documents for the rehabilitation of Concourse C/D at Washington Dulles International Airport. Design services are required to extend the useful life of midfield Concourse C/D to accommodate United Airlines operations for an additional seven to ten years. The Authority upgraded Concourse C/D to provide appropriate standards for safety, aesthetics, service level, and increased capacity for current and future domestic and international passenger traffic. Tasks have included interior improvements to the... Continue Reading

Tunnel & Vehicle Service Facility Renovations

GES key personnel provided the MEP & FP engineering services for various projects including the Ninth Street Tunnel Renovation, Twelfth Street Tunnel Renovation and a New Vehicle Inspection... Continue Reading

WMATA Service & Inspection Shops

The purpose of this $25,000,000, 130,000gsf new construction project was to accelerate Washington Metro's Capital Improvement Program (CIP), a 20-year capital program to maintain a high level of service on the 103-mile Metrorail system. GES key personnel provided the MEP & FP engineering services MEP systems for spaces such as: blow-out pit, car wash (both automatic & hand wash), car interior cleaning track, several other track for service & inspection of metro cars, bulk storage area, chemical storage rooms, steam wash area, office spaces, paint and fiberglass body shop and... Continue Reading